The use of wireless instruments in pipelines and gas production operations has been gaining momentum over the past few years. Driven by cost-cutting measures and the need to gain more operational visibility to meet regulatory requirements, wireless instruments eliminate expensive trenching and cabling while providing access to hard-to-reach areas using self-contained, battery-powered instruments. However, SCADA engineers and operators are facing the challenge of integrating wireless instrumentation networks with other communication infrastructure available in the field. Managing and debugging dispersed wireless networks presents a new level of complexity to field operators that could deter them from adopting wireless instrumentation - despite the exceptional savings that are possible.
This article looks into the particular ways in which operators can tightly integrate wireless instrumentation networks with SCADA and realise the full benefits of such an integrated solution.
The evolution of wireless
Ever since Guglielmo Marconi sent the first telegraph signal across the Atlantic, wireless has become part of our everyday lives. However, the last ten years have seen a dramatic change, not only in the radio technology, but, more importantly, in how we use it as consumers and process control professionals. Gas producers and pipeline companies have relied for many years on long-range wireless technology to transmit and distribute critical operational data using a wide range of technologies, including satellite, VHF, UHF and licence-free spread spectrum. As more consumers have lined up to acquire the latest smart phones with embedded Wi-Fi, Bluetooth and broadband capabilities, the price of radio modules has plummeted over the past three years. This has made it easier for industrial vendors to integrate radio modules into a long list of devices and sensors. As a result, the oil and gas industry has seen an increase in wireless instrumentation, also broadly known as wireless sensor networks, offered from major process control and SCADA suppliers. Wireless has become the holy grail of the industry, with editors and pundits predicting double digit annual growth and a $1.2 billion market by 2012.
The business case behind deploying wireless instrumentation is a compelling one. By eliminating cabling and trenching, you can dramatically reduce the cost of deployment by as much as 70%. Since wireless instrumentation is battery powered, they are much easier to deploy in the field, relative to their conventional counterparts. Wired systems can take days or weeks to be properly installed. Wireless instruments require only the sensor to be installed in the process, saving hours or days and valuable resources. Other instruments can be added as needed.
Safety and compliance with environmental requirements are major driving factors. In gas production, using wireless pressure sensors during the initial flowback period reduces the risk to personnel, who would otherwise need to be in close proximity to a volatile and toxic well in order to read manual pressure gauges and to report on production readiness. During the flowback period before a wired solution can be installed, wireless pressure sensors put the well analyst in touch with the well, enabling remote trending and analysis. Environmental regulations in many regions require the use of a vapour recovery unit (VRU) to burn off residual gases from separators and condensate tanks. An easy-to-install wireless temperature sensor can monitor the VRU and report an alarm condition if the flame goes out.
Wireless instrumentation is a different game
So if the business case is so strong and the return on investment is solid, why are some still reluctant to deploy wireless instrumentation in their facilities? There are three main reasons - concerns over reliability, adaptability and integration.
Reliability
In industrial applications, reliability is a major concern. Wireless instrumentation must be as reliable as conventional wired units. Even in simple applications like remote monitoring, users come to expect a certain level of reliability and network availability. Wired systems are much easier to diagnose and trace because the medium, the wire, is physically there or could be dug out. Wireless, on the other hand, uses the invisible free space as a medium. Radio signals are subject to free space attenuation, where the signal loses strength at a rate proportional to the square of the distance travelled. Radio signals are also subject to reflection as a result of structures, trees, water bodies and buildings. Furthermore, interference from nearby wireless systems such as mobile phone towers adds more challenges.
RF design is getting better in addressing many of these issues. By designing highly sensitive radio receivers, using the transmit power more efficiently and high gain antennas, engineers are able to establish highly reliable RF point-to-multipoint links.
Adaptability
Wireless instrumentation networks are required to adapt to the existing environment. It is not practical to move a wellhead, a compressor, a tank or a separator just to create a reliable wireless link. In long-range SCADA networks, it would be much easier to locate a 10-metre tower in the field to allow for line-of-sight consideration. It might also be easier to increase the height of the tower to extend the range and avoid obstruction. Wireless instrumentation networks do not have that luxury. It is sometimes difficult to find a location for an access point or base radio that provides reliable communication with the wireless instruments. Relocating the access point or base radio to improve the RF link with one sensor could result in degrading the links with other sensors in the same network.
Adaptability can be addressed by using lower frequency bands, such as the licence-free 900 MHz band that tends to provide better coverage, longer range and better propagation characteristics, allowing the signal to penetrate obstacles. Also, high-gain external antennas that can be mounted as high as possible on a structure allow access to hard-to-reach sensors which could be located at the bottom of a tank. Improved receive sensitivity of radio modules also plays a crucial role in ensuring network adaptability to various industrial environments.
Integration
Most gas production and processing plants, and pipeline facilities, have some level of wireless capability in place. Long-range proprietary SCADA networks, backhaul point-to-point networks and wireless local area networks are some of the common systems deployed. Each of these networks is being used for a specific purpose such as control data transmission, high bandwidth communication and video surveillance. Engineers and operators are facing the challenge of integrating wireless instrumentation networks with other communication infrastructure available in the field. Managing and debugging dispersed wireless networks presents a new level of complexity to field operators that could deter them from adopting wireless instrumentation, despite the potential exceptional savings.
The wireless network integration dilemma is more apparent in SCADA systems. Since wireless instrumentation networks are supposed to tie into the same SCADA infrastructure available at the site in order to relay valuable operating data to the SCADA host, having the ability to manage the complete infrastructure as one network becomes essential.
Moreover, having the ability to access hard-to-reach areas and gather new data points that were not economically viable before gives the operator better visibility into the process and plant operations. However, this data has to end up somewhere in the system in order to be monitored, analysed and leveraged. SCADA systems are normally designed to handle a certain number of data points or tags - scaling up the system to handle additional data points, and integrate them in trends and reports, could be costly.
Despite the abundance of tools available in the process control market to capture, process and analyse data, ensuring data integration is still a major problem. Some SCADA systems even have a separate historian module that must be purchased as an add-on, to handle the flood of data as a result of adding wireless instrumentation networks.
Addressing the wireless and data integration challenges
A new breed of advanced wireless instrumentation base station radios or gateways is now emerging in the marketplace to address this need. This new generation of gateways integrates both a wireless instrumentation base radio and a long-range industrial radio in the same device. The wireless instrumentation base radio has a Modbus data port, allowing an external Modbus Master to poll information from the base radio about its own status as well as the status and process values of its field units. It also has a diagnostics port, allowing the connection of network management software for sensor configuration and diagnostics. Both of these data streams are sent simultaneously through an advanced long-range serial or ethernet radio network. This is how it works in practice:
- The wireless instrumentation base radio and all field units must have the RF channel and baud rate set identically.
- Each field unit must then have its RF ID set to a unique value. This value will be used later for Modbus polling of the data.
- The base radio’s Modbus serial port baud rate must be set to match that of the long-range radio.
- The base radio’s Device ID must be set. This value will be required later for Modbus polling of the system.
The integrated long-range remote radio is configured as a remote device, relaying information to a master radio at the main SCADA centre. The available serial ports on the radio are configured to tunnel Modbus polling and diagnostic data simultaneously to the wireless instrumentation base radio. This allows operators to manage and diagnose the wireless instrumentation network through the existing long-range SCADA infrastructure. Live data and status information for all field units are displayed in a separate view or integrated in the SCADA host.
|
On the data integration front, modern SCADA host software offers a fully integrated environment that includes an integrated and scalable historian to handle more additional data without going through expensive and sometimes lengthy upgrades. Developing the SCADA screens based on templates allows engineers to add data points easily and rapidly in their systems.
Conclusion
As the adoption of wireless instrumentation networks increases, users will be faced with a number of challenges to ensure reliability, adaptability and tight integration with their existing infrastructure. New RF and antenna designs help to address reliability and adaptability challenges. This leaves wireless and data integration with the existing SCADA infrastructure as one of the critical challenges to be resolved. Luckily, hybrid gateways, where sensor network base radio and long-range radio are integrated, allow users to view, manage and diagnose their dispersed wireless systems from a single point. Similarly, advanced SCADA host software, with an integrated historian and rapid development environment using templates, can facilitate the integration of new data points generated by a growing network of wireless sensors.
By Hany Fouda*
* About the author
Hany Fouda is VP of Marketing at Control Microsystems. From 1995 to 2007, Hany held various sales and marketing positions within the company. Prior to Control Microsystems, Hany worked for Digital Equipment, Yokogawa Electric, and, more recently, General Electric. He has a BEng in telecommunications and a Masters degree in engineering from Carleton University.
Good for today, ready for tomorrow: how the DCS is adapting to meet changing needs
The future DCS will be modular and offer a more digital experience with another level of...
Software-based process orchestration improves visibility at hydrogen facility
Toyota Australia implemented software-based process orchestration from Emerson at its Altona...
Melbourne Water achieves sustainability goals with MPC
Model predictive control technology helps Melbourne Water reduce water release surplus and...