ABB technology to power Jansz-Io Compression project

ABB Australia Pty Ltd

Friday, 20 August, 2021

ABB technology to power Jansz-Io Compression project

ABB has won an order worth approximately $120 million to supply the overall electrical power system (EPS) for the multi-billion-dollar Jansz-Io Compression (J-IC) project. The order, comprising contracts with Chevron Australia Pty Ltd and with Aker Solutions, is booked in Q3 2021.

The Jansz-Io field is located around 200 km off the north-western coast of Australia, at water depths of approximately 1400 m. The field is a part of the Chevron-operated Gorgon natural gas project, one of the world’s largest natural gas developments. The J-IC project, which moves gas from the deep sea to shore, marks only the third time that world-leading subsea compression technology is being deployed globally and the first time outside of the Åsgard and Gullfaks fields in Norway where ABB is also responsible for providing the EPS. The project will involve the construction and installation of a 27,000-tonne (topside and hull) normally unattended floating Field Control Station (FCS), approximately 6500 tonnes of subsea compression infrastructure and a 135 km submarine power cable linked to Barrow Island.

“The Jansz-Io Compression project is a major enabler in maintaining an important source of natural gas to customers in Asia Pacific. It will support energy transition across the region where many countries primarily rely on coal for energy generation,” said Peter Terwiesch, President, Process Automation at ABB. “Burning natural gas produces around half as much carbon dioxide per unit of energy compared with coal. We’re proud to be leading the way in the global energy industry by pioneering innovative subsea power technologies that bring us closer to a carbon neutral future. This project reflects our close collaboration and trusted subsea history with Chevron and Aker Solutions.”

“This game-changing technology significantly reduces power consumption and emissions compared to power generated offshore by local gas turbines and compressors located topside,” said Brandon Spencer, President, Energy Industries at ABB. “Subsea compressors are key to helping improve reservoir recoverability and ensuring optimal use of resources from existing fields.”

“This is a very important project for us as it supports our commitment to enable lower-carbon oil and gas production and develop renewable solutions to meet future energy needs,” added Maria Peralta, Subsea Executive Vice-President at Aker Solutions. “We are pleased to once again be joining forces with ABB to take subsea solutions to the next level and accelerate the transition to sustainable energy production.”

ABB will provide the majority of the electrical equipment, both topside and subsea, for J-IC. The project will combine two core ABB technologies — power from shore and variable speed drive (VSD) long step-out subsea power — for the first time. The electrical system will be able to transmit 100 MVA over a distance of approximately 140 km and at depths of 1400 m.

The contract was awarded following concept development and a front-end engineering and design (FEED) study. Work will start immediately and the subsea compression system is expected to be in operation in 2025.

Related News

OCP and Fortescue to develop green hydrogen and ammonia in Morocco

OCP Group, a manufacturer of plant nutrition and phosphate-based fertilisers, and Fortescue...

UQ turns carbon dioxide into sustainable power

Researchers at the University of Queensland have built a generator that absorbs carbon dioxide to...

Siemens announces Beyond 1% Summit in Sydney

The Siemens Beyond 1% Summit in Sydney in July will focus on accelerating digitalisation for...


  • All content Copyright © 2024 Westwick-Farrow Pty Ltd